Firma „Pluton” pomyślnie zakończyła modernizację dwóch podstacji trakcyjnych – Wacława i Zapolska Więcej szczegółów
Polska |pl

14 years of successful cooperation

Obiekty

Combined traction step-down substation-14, "Nasimi" station
Combined traction step-down substation-15 "Azadlig Prospekti"

Wykonane prace

Two combined traction step-down "turn-key" substations (supply, installation, commissioning, startup).

Obiekty

Step-down substation SDS-9, "Koroglu"

Wykonane prace

Replacement of step-down substation outdated equipment for the up-to-date modern equipment. Implementation of "turn-key" project (supply, installation, commissioning, startup).

Obiekty

Step-down substation-15 of Technological building

Wykonane prace

Supply of "turn-key" step-down substation (design, supply, installation, commissioning).

Distinctive features

Interesting design solution was implemented on this site: automatic load transfer for 4 inputs, which provides faster power supply recovery in case of emergencies. Also, PLUTON carried out supply of uninterruptible power supply system Benning 160 kVA, which provides uninterruptible power supply for all metro operator's control centers. Accumulator batteries with increased capacity with total capacity of 2900 A⋅h.

Obiekty

TSS, LPS and VSS, "Memar Ajami" and "Avtovagzal" stations

Wykonane prace

"Turn-key" supply of 6 substations: two traction (TSS), two step-down (LPS) and two ventilating shaft substations (VSS) for "Memar Ajami" and "Avtovagzal" stations. Development of power supply system working design, installation, commissioning, startup of power supply objects.

Distinctive features

Non-standard object-oriented project: for the first time in the post-Soviet area 35 kV were implemented under the ground.

Obiekty

Combined traction step-down susbstation-6, "Elmlar Akademiyasi" station

Wykonane prace

"Turn-key" supply of combined traction step-down substation (supply, installation supervision, adjustment supervision, startup).

Obiekty

Step-down substation-6, "Ganjlik"

Wykonane prace

"Turn-key" supply of step-down substation (supply, installation supervision, adjustment supervision, startup).

Since 2008, PLUTON carries out integrated supply of equipment of new generation for reliable power supply of the Red line, the Green line and the Purple line of Baku Metro.

Over the last 10 years, due to our solutions, were implemented the most up-to-date technologies at 7 step-down substations, 2 traction and 3 combined traction step-down substations on the stations "Nasimi", "Azadlig Prospekti", "Koroglu", "Avtovagzal", "Memar Ajami", "Elmlar Akademiyasi", "Ganjlik" and Technological building of Baku Metro.

Scope pf supply for substation includes a full range of PLUTON equipment manufactured for metro:

  • medium voltage switchgears;
  • rectifiers V-ТPЕD-2,5k-825-12P with RESIBLOC rectifier transformers;
  • DC switchgears 825 V, RU-825ОSH;
  • complete switchgears KRU-0.4k, KRU-0.23k, KRU-0.4/0.23k;
  • DC boards SHCHPT-220;
  • cabinets with counters SHS;
  • charging and rectifying units VTEU1-100/230 and UBP-220/60-5;
  • remote control system (substation electrotechnical equipment control (including ventilation substation equipment, located more than 2 km away), including automated workstation of substation operator with developed special-purpose software, remote control cabinet with controllers and communication means);
  • voltage inverter cabinets SHIN;
  • reactive power compensation units UКRМ;
  • capacitor units UK;
  • output terminal blocks cabinets SHVK;
  • accumulator batteries;
  • auxiliary transformers;
  • cabinets with accumulator batteries SHАKB;
  • operating current cabinets SHOT1М-380-25-230;
  • power supply cabinet SHSKТZ;
  • ventilation and air conditioning control cabinets;
  • distribution cabinets;
  • section boxes;
  • switchgears for tunnels: RU-825LR, RU-825PK, RU-825LK.